C&T Contracting was awarded the contract to replace the existing WWTP with a new plant that is fabricated by Pollution Control Systems. This turn-key wastewater treatment facility includes a control and electrical building, blower station, and rehabilitation of the 3 RIBS (rapid infiltration basins). Expedited completion of the project is in the 1st quarter of 2023.